The main floor of the new Voss elevator is sided with finishing walls. The walls were stained and coated to not only give the elevator a neat interior but to cut dust accumulation. Waverly Democrat; 16 Sept. 1960p9. Accession No. 91N0558 Additional photographs and resources can be found at the Waverly Public Library on the local and family history page http://www.waverlyia.com/public-library/research/local-and-family-history-collection.aspx
Comments:
The main floor of the new Voss elevator is sided with finishing walls. The walls were stained and coated to not only give the elevator a neat interior but to cut dust accumulation. Waverly Democrat; 16 Sept. 1960p9. Accession No. 91N0558 Additional photographs and resources can be found at the Waverly Public Library on the local and family history page http://www.waverlyia.com/public-library/research/local-and-family-history-collection.aspx