Demolition of the SE 12th St. bridge over the old CGW tracks was done by the Peterson Contractors of Reinbeck. It was replaced by a large culvert to allow the bike trail to pass through. Additional photographs and resources can be found at the Waverly Public Library on the local and family history page http://www.waverlyia.com/public-library/research/local-and-family-history-collection.aspx Accession No. 98N0235
Comments:
Demolition of the SE 12th St. bridge over the old CGW tracks was done by the Peterson Contractors of Reinbeck. It was replaced by a large culvert to allow the bike trail to pass through. Additional photographs and resources can be found at the Waverly Public Library on the local and family history page http://www.waverlyia.com/public-library/research/local-and-family-history-collection.aspx Accession No. 98N0235