This photograph was taken during the construction of the Bremer Avenue Bridge which was completed in late summer of 1950. Looking east. The bridge opened in to Motorists in Sept. It appears that the north sidewalk is still blocked. In October the bridge and walks were all completed. The bridge lasted until August 2024 when it was removed. The replacement is due to open in Sept./Oct. 2025.
Additional photographs and resources can be found at the Waverly Public Library on the local and family history page http://www.waverlyia.com/public-library/research/local-and-family-history-collection.aspx Accession No. 92A0030
Comments:
This photograph was taken during the construction of the Bremer Avenue Bridge which was completed in late summer of 1950. Looking east. The bridge opened in to Motorists in Sept. It appears that the north sidewalk is still blocked. In October the bridge and walks were all completed. The bridge lasted until August 2024 when it was removed. The replacement is due to open in Sept./Oct. 2025. Additional photographs and resources can be found at the Waverly Public Library on the local and family history page http://www.waverlyia.com/public-library/research/local-and-family-history-collection.aspx Accession No. 92A0030