Waverly Newspaper, Looking SSE Murphy addition is in the foreground. A good view of the path of Cedar Lane. In 2024/2025 that lane [widened where possible] serves as one of the major ways to bypass the Bremer Ave. bridge [which currently doesn't exist, but was scheduled to be completed in September 2025. However, high water washed out the coffer dam and may delay completion.
Additional photographs and resources can be found at the Waverly Public Library on the local and family history page http://www.waverlyia.com/public-library/research/local-and-family-history-collection.aspx Accession No. 89N0076.
Comments:
Waverly Newspaper, Looking SSE Murphy addition is in the foreground. A good view of the path of Cedar Lane. In 2024/2025 that lane [widened where possible] serves as one of the major ways to bypass the Bremer Ave. bridge [which currently doesn't exist, but was scheduled to be completed in September 2025. However, high water washed out the coffer dam and may delay completion. Additional photographs and resources can be found at the Waverly Public Library on the local and family history page http://www.waverlyia.com/public-library/research/local-and-family-history-collection.aspx Accession No. 89N0076.